The contractor assessed several solutions aimed at restoring natural tidal dynamics to increase water flow and deter Phragmites spread. Infrastructure-based restoration uses targeted upgrades to naturally restore tidal dynamics, offering a minimally invasive, cost-effective alternative to dredging. This approach improves wetland resilience, supports native plant communities, and emphasizes adaptive planning through interagency collaboration and engineering-informed restoration.

Background

Full Tidal Restoration Techniques

Previous culvert infrastructure severely limited tidal exchange. Restoration benefits are contingent on full tidal pathway functionality. 

Preferred Restoration approach

Culvert replacement for hydrological restoration would enhance tidal flow to the PSP wetland, increase salinity and water levels, reduce conditions favorable to Phragmites

Infrastructure-based restoration

This approach uses targeted infrastructure upgrades to naturally restore tidal dynamics, representing a minimally invasive, cost-effective alternative to dredging or extensive regrading. 

Ecological and community benefits

Ecological and community benefits to the surrounding area include restored wetland ecology and improved tidal flow that will increase wetland resilience as well as restore native plant communities. 

Adaptive planning and collaboration

Highlights the importance of interagency communication, jurisdiction clarity, and engineering-driven ecological restoration.